A Remote Restroom Is Only as Practical as Its Service Access

The park district has endorsed the funding of an additional public toilet. The project team has selected the site, and the structure is deemed to be appropriate and is now ready to move forward. The contractor begins to review the site. There is a water issue on the site proposed. There are more utility connections than what was expected. Delivery vehicles might have trouble reaching the building site and the construction configuration might not align with the available space.

Image credit: romtec.com

The project won’t be suspended if none the issues are addressed. This can result in revisions, costs and delays in construction. For developers and public agencies bathroom projects, it is much more manageable if the site’s conditions affect the construction selection from the beginning.

A drawing of a building doesn’t tell the Full Story

Teams for projects should take into consideration the size of the property prior to choosing the prefabricated park restroom. The slope of the site as well as the soil and drainage conditions along with utility availability and construction access will all affect the design. For instance, a bathroom constructed near a playground could require connections to the existing water and sewer infrastructure. If these connections are not available or costly to expand or extend, the construction may require another sanitation strategy. In addition to the applicable codes and accessibility standards, site-specific conditions must be considered when determining foundation and placement of a building. The standard layout of buildings may appear to appear to be acceptable on paper, however, it will require significant changes once these factors are taken into account.

Urban Projects Have Their Own Construction Restrictions

Installing restrooms on sidewalks is more than just finding the space to build a small structure. These sidewalks typically contain underground utilities and sidewalk furniture, pedestrian routes, and nearby building entrances. Collaboration with local authorities is often required for construction activities. If a toilet is located too close to an existing utility line, it might cause excavation or foundation problems. Accessibility is another aspect to consider. The entrance as well as the surrounding route must be in compliance with all requirements applicable to the project. Romtec offers customizable ADA single-user toilet units with options for the locations of doors and sinks. Project teams can prepare for public usage as well as addressing physical limitations.

Do you have no sewer Connection? You don’t have a sewer connection? Think about alternatives

Remote recreation sites have different infrastructure problems. The trailhead could be several miles away from the closest sewer, which makes flushing toilets a non-sensical option. In appropriate locations, vault toilets provide a waterless alternative. Instead of transferring wastewater through a sewer system, these toilets store waste in the vault, which must be serviced periodically. The choice of vault toilets does not remove the need for the site’s planning. The project needs to be constructed in a suitable location, with adequate surface conditions, accessibility to equipment that can be serviced safely with adequate ventilation and the compliance with environmental regulations. Romtec creates water-free vault bathrooms using Sweet-Smelling Technology (SST) which is a method that is designed to manage smells through ventilation. If you live in remote areas, choosing the sanitation system at an early stage can help prevent costly changes to the structure later.

Construction Coordination begins before delivery

A common misconception about prefabricated construction is that the majority of projects have already had their decisions made by the manufacturer. However, in reality, there are still many things to coordinate. These include foundation and site preparation, accessibility, connections to utilities and local approvals. Romtec offers customized building kits, design assistance and other services that can assist in these endeavors. The company works closely with landscape designers and contractors to ensure that construction specifications are in line with site-specific specifications. This is especially helpful when the restroom needs to be in line with the existing architectural style or adapt to unique particular property requirements.

A better project starts with Better Questions

Owners have to determine the location of the restroom, the way construction equipment is allowed to enter the site, as well as the approvals required. They must also be aware of whether the selected sanitation system is suitable for the anticipated amount of guests and if it can be installed without a major overhaul of the surrounding infrastructure. These aren’t as exciting as exterior finishes or architectural aspects, but can have more of an impact on the project’s costs and timeframe. The public restroom projects which are successful don’t only deliver the building in time. It’s one that has the building infrastructure, site infrastructure and construction process as well as the purpose of the restroom have been analyzed in conjunction. The final bathroom is more efficient if the decisions are made in advance.